主页 反馈 内容 搜索

业绩
上一页 下一页

 

新闻
产品
业绩
服务

 

近几年为重点工程项目提供带式输送机业绩表

   Belt Conveyors Manufactured for Some Major Projects in Recent Years

项目

Project

带宽

Belt

Width

mm

最大带速

Max.Belt

Speed

m/s

最大运量

Max.

Conveying

Capacity

t/h
总输送距离

Total

Conveying

Distance

m
最大单机驱动功率

Max.Driving

Power of one

Belt conveyor

kw
年份

year

 

 

 

备注

Remark

石臼所港煤码头

Shijiusuo Coal Terminal

2200 4.3 6000 11000 3×350 1983 与日本合作生产

cooperating with the company of Japan

秦皇岛港煤码头

Qinhuangdao Coal Terminal

2200 5.2 6750 12500 3×315 1987 与德国合作生产

cooperating with the company of Germany 

福建东渡港煤码头

Fujian Dongdugang Coal Terminal

1200 2.5 1000 2600 132 1992  
大连小野田水泥公司水泥码头

Cement Terminal of Dalian  

Onoda Cement Co.
1400 1.25 1000 512 90 1992 与日本合作生产

cooperating with the company of Japan

青岛港前湾煤码头一期工程

the 1st stage project of Qianwan Coal Terminal of Qingdao Seaport

2000 4.6 4800 5400 3×300 1993 与日本合作生产

cooperating with the company of Japan

广州新沙港区煤矿石码头

Guangzhou Xinshagang Coal Terminal

1400 3.15 2000 1400 2×110 1993 与法国合作生产

cooperating with the company of France

北仑港区20万吨级矿石码头

Beilungang Ore Terminal 200,000 ton

1600 3.15 5250 9387 3×450 1995  
深圳小野田水泥有限公司码头

Wharf of Shenzhen Onoda Cement Co.,Ltd

1400 2 1000 130 55 1995 全封闭、散装水泥用

being completely enclosed for cement in bulk

上海罗泾煤码头

Shanghai luojing Coal Terminal

1600 3.15 3000 7580 2×250 1996 上海十大优质工程

one of the ten largest superior project in Shanghai

宝山钢铁公司二期工程

the 2nd stage Project of Baoshan Iron Steel Co.

2000 2.9 1500 5091 220 1988 获“国家重大技术装备成果”三等奖

with the 3rd grade Award of “NationalImportant Technology Equipment Achievement”

宝山钢铁公司2#高炉

2Blast Furnace of Baoshan

Iron Steel Co.
1800 2 2815 345 4×250 1989 获“国家重大技术装备成果”表彰证书

with the Certificate of “NationalImportant Technology Equipment Achievement”

武汉钢铁公司新3#高炉

New 3Blast Furnace of Wuhan Iron Steel Co.

1800 2 3500 399 4×315 1989  
首都钢铁公司新4#高炉

New 4Blast Furnace of Capital Iron Steel Co.

1600 2 2180 450 4×220 1991  
宝山钢铁公司三期工程

the 3rd stage Project of Baoshan Iron Steel Co.

2200 3.15 4500 17000 4×355 1991  
首都钢铁公司

Capital Iron Steel Co.

1800 3.15 4000 4800 3×315 1991  
宝山钢铁公司3#高炉

3Blast Furnace of Baoshan Iron Steel Co.

2200 2 3030 347 4×355 1992  
马鞍山钢铁公司原料场

Raw Material Yard of Ma'anshan Iron Steel Co.

1400 1.4 2000 16900 2×250 1992 获“优质产品、优良服务”铜匾奖

with “the Bronze Medal of High Quality Product& Knight Service”

包头钢铁公司4#高炉

4Blast Furnace of Baotou Iron Steel Co.

1600 2 2000 380 4×250 1995  
山东石横电厂

Shandong Shiheng Power Plant

 
1200 2.5 1000 3000 250 1984 获国家重大技术装备成果表彰证书300MW

with the Certificate of National Important Technology Equipment Achievement

安徽平圩电厂

Anhui Pingwei Power Plant

 
1400 2.5 1600 2000 2×160 1985 获国家重大技术装备特等证书600MW

with the top grade Certificate of NationalImportant Technology Equipment Achievement

甘肃靖远电厂一期工程

The 1st stage project of GansuJingyuan Power Plant

1200 2.5 1080 2000 250 1987 与美国合作生产  4×300MW

cooperating with the companies from U.S.A

武汉阳罗电厂一期工程

The 1st stage project of WuhanYangluo Power Plant

1400 3.15 1500 3193 280 1991 2×300MW
甘肃靖远电厂二期工程

The 2nd stage project of GansuJingyuan Power Plant

1200 2.5 1000 3500 250 1994  
湖北鄂州电厂

Hubei E'zhou Power Plant

1400 2.8 1800 2770 355 1995 300MW
三峡水电站人工砂石系统

Sanxia Power Station

1400 2 1650 1286 132 1996  
内蒙古伊敏河电厂

Yiminhe Power Plant of  Inner Mongolia

1600 3.15 2400 7332 200 1996 CST 软启动

CST soft starting  

江西丰城电厂

Jiangxi Fengcheng Power Plant

1400 2.5 1500 2230 315 1995 4×500MW

 

陕西神木电厂

Shanxi Shenmu Power Plant

1000 2 600 2100 160 1996  
河南洛阳热电厂

He'nan Luoyang Power Plant

1400 2.5 1000 9566 250 1997 2×300MW

 

湖南湘潭电厂B厂

Hunan Xiangtan Power Plant

1400 2.5 1500 1565 315 1997 2×300MW

 

陕西宝鸡二电厂

The 2nd Power Plant of Shanxi BaoJi

1400 3.15 1500 1173 315 1997 4×300MW
北京第一热电厂

The 1st Power Plant of Beijing

1400 2.5 1700 2974 2×250 1997  
四川二滩水电站木材过坝工程

Sichuan Er'tan Power Station

1800 1.2 5000 2000 2×220 1997  
漳州后石电厂

Zhangzhou Houshi Power Plant 

2000 3.15 4000 8500 3×450 1998 6×600MW

 

北仑电厂

Beilun Power Plant

1800 3.15 1500 10000 2×400 1998 2×200MW

与德国合作生产

cooperating with the company of Germany
福建省顺昌水泥厂

Fujian Shunchang Cement Plant

 
800 2.5 600 3742 3×155 1987 获机电部沈阳市科技进步三等奖

with the 3nd grade award of Shenyang Science development by the Machinery Electric Industry Ministry

华新水泥股份公司隧道运料系统

Tunnel Transportation System of Huaxin Cement Co.,Ltd.

1000 2.5 970 3373 3×400 1995  
安徽海螺集团宁国水泥厂

Ningguo Cement Plant of Anhui Hailuo Group

1200 2 720 3246 75 1996  
云南小龙潭露天煤矿

Yunnan Xiaolongtan Coal Open pit

1200 4.5 2923 13340 2×460 1985  
山东新汶矿务局张庄矿华丰矿

Zhangzhuang Mine and Huafeng Mine of Shandong Xinwen Mine Bureau

 

1000

 
4 1500 4145 2×450 1985 用于主斜井的钢带机

the cable belt conveyor for main inclined shaft

 
淮北临溪选煤厂

Huaibei Linxi Coal Selection Plant

1000 2 1200 2761 2×315 1987  
大同矿务局四台沟大巷主斜井

Sitaigou Daxiang of Datong Mining Bureau

1400 3.15 1700 4397 3×560 1988  
金川镍矿井下工程

Jinchuan Nickel Mine(underground)

1200 2.5 1600 1800 260 1988 中、澳合作生产

cooperating with the company of Australia

大同矿务局燕子矿装车系统

Yanzishan Mine of Datong Mining Bureau

2134 4 5200 430 900HP 1988 与美国合作生产 

cooperating with the companies from U.S.A

大同落里湾煤炭集运站

Datong Luoliwan Coal Distribution Station

2000 4 5200 187 2×450 1988 获“国家重大技术装备成果”二等奖

with the 2nd grade Award of “NationalImportant Technology Equipment Achievement”

神府煤田大柳塔煤矿主井

Daliuta Coal Mine of Shenfu Coalfield

1200 4 2000 4620 3×400 1990  
山西阳泉矿务局荫营煤矿改扩建

Yinying Coal Mine of Shanxi Yangquan Mining Bureau

1000 2.7 660 1803 2×450 1990 用于主斜井的钢带机

the cable belt conveyor for main inclined shaft

内蒙古扎赉诺尔铁北矿北斜井

Zhalainuo'er Tiebei Mine ofInner Mongolia

1000

 

2.5 700 1721 125 1990 吊挂式带式输送机

suspended belt conveyor

霍林河矿区地面生产系统

Ground production system ofHuolinhe Mine

1400 4 2000 1816 2×250 1991  
大雁矿务局

Dayan Mining Industry Bureau

1000 2.9 450 1056 2×355 1992  
中矿公司准格尔一期工程洗煤厂

Zhunge'er project of China Mining Co.

1600 2.5 2500 129 2×460 1992  
七台河矿务局东风矿

Dongfeng Mine of Qitaihe Mining Bureau

800 3.15 1200 1066 2×450 1992 大倾角

large inclination

鞍钢矿山公司大孤山铁矿

Dagushan Iron Mine of Angang Mine Co.

1400 3.15 3700 1618 3×315 1992 移置式胶带机

movable belt conveyor

大同矿务局新高山煤炭集运站

New Gaoshan Coal Distribute Station of Datong Mining Bureau

2000 4 5200 129 2×355 1993  
准格尔一期工程黑岱沟选煤厂

Heidaigou Coal Separating Plant of the 1st Stage Zhunge'er Project

1600 2.5 2300 1260 110 1993  
巴基斯坦山达克铜矿

Santak Copper Mine of Pakistan

1600 2.5 1600 2166 2×280 1993  
山西长子色头煤矿

Shanxi Changzi Setou Coal Mine

800 2 300 425 250 1993 大倾角

large inclination

元宝山露天矿

Yuanbaoshan Open-pit 

2000